SunSynk 5kW Solar System With Sunsynk Battery LFP Wall Mount 5.32kWh 51.2V Fully Installed
Regular price
R 105,000.00
Couldn't load pickup availability
SunSynk 5kW Solar System With Sunsynk Battery LFP Wall Mount 5.32kWh 51.2V Fully Installed
Photovoltaic Panels | |||
5 | JAM66S-30-500-MR-MC4 | JA Solar 500W Mono PERC Half-Cell MBB Silver Frame MC4 Connectors | |
Inverters | |||
Mounting Kit | |||
1 | DNLS10MB | Dektite Lead Multicable Solar Flashing (Tiled or Slate) | |
8 | REN-420080 | RS1 Universal End and Mid Clamp 30 - 50mm Silver ONE FOR ALL | |
6 | REN-420082 | Middle Clamp+ 30 - 50mm Silver | |
32 | REN-900318 | Wood screw pan head 6 x 80 SIT30 Single (900318) | |
16 | REN-420181 | Roof hook UK Plain tiles/slates (without wood screw) | |
8 | REN-900246 | VarioSole + End Cap 41X35 rail Single - Grey | |
4 | REN-400531 | VarioSole+ Rail connector for rail 41 x 35 mm | |
7 | REN-400523 | VarioSole+ Mounting rail 41 x 35 x 2225 mm | |
Cable | |||
2 | MC4-2M-1 | MC4 Pre terminated cable 2m (1 Pack) | |
1 | MC4-CONN14-2-PACK | MC4 Connector Twin Pack ( Kit 1 ) 0014/0015 | |
1 | CABLE-4-25-B | 4mm2 single-core PV DC cable 25m - Black | |
Switches | |||
3 | KG41-T203-GBA270 | K&N Single Phase AC Switch Disconnector 40A | |
Meters | |||
Display | |||
Labels | |||
1 | BOHAZARD-SET | PV on Roof and Hazard Labels Pack | |
1 | SUN-5.0 | Sunsynk 5kW, 48Vdc Single Phase Hybrid Inverter with WIFI included | |
1 | DCB-NF-2I-600V-I16A-I_II-2O | 600V Protection Box 2 Inputs 2 Outputs 16A Isolator Type I_II SPD | |
1 | SUN-L5.12 | Sunsynk 5.12kWh 51.2V Battery | |
2 | CABLE-25-1-HV-PAIR | 25mm2 single-core HV DC cable 1m - Pair | |
1 | ACDB-ARENB-25A | Earth Neutral Bridge Box Single Phase 25A |
Full Installation Notes
- Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Durban, Pietermaritzburg and within 50kms of those main centers.
- No extreme angle roof types (>30 degrees) and no slate roof types that may require slate kits.
- Extra will have to be charged if panel lifts are required or ladder rental for very high roofs.
- Offer assumes that installation point is within 20M from mains db board.
- Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.