SunSynk 5kW Solar System With 1 x 5.5kw Hubble Battery Fully Installed

In stock
SKU: SunSynk 5kW Solar System With 1 x 5.5kw Hubble Battery Fully Installed
Regular price R 106,000.00

SunSynk 5kW Solar System With 1 x 5.5kw Hubble Battery Fully Installed


Photovoltaic Panels
7   SRP-460-BMB-HV-SF Seraphim SIV Monocrystalline Series 460Wp Silver Frame
Inverters
Mounting Kit
1   DNLS10MB Dektite Lead Multicable Solar Flashing (Tiled or Slate)
8   REN-420080 RS1 Universal End and Mid Clamp 30 - 50mm Silver ONE FOR ALL
10   REN-420082 Middle Clamp+ 30 - 50mm Silver
66   REN-900318 Wood screw pan head 6 x 80 SIT30 Single (900318)
22   REN-420150 VarioSole Stainless Steel roof hook for Pantiles No Wood Screws
8   REN-900246 VarioSole + End Cap 41X35 rail Single - Grey
6   REN-400531 VarioSole+ Rail connector for rail 41 x 35 mm
10   REN-400523 VarioSole+ Mounting rail 41 x 35 x 2225 mm
Cable
2   MC4-2M-1 MC4 Pre terminated cable 2m (1 Pack)
1   JA-QC4-10-35-1500V QC4.10-35 1500V Connector for JA Solar modules PAIR
1   CABLE-4-25-B 4mm2 single-core PV DC cable 25m - Black
Switches
3   KG41-T203-GBA270 K&N Single Phase AC Switch Disconnector 40A
Meters
Display
Labels
1   BOHAZARD-SET PV on Roof and Hazard Labels Pack
1   SUN-5.0 Sunsynk 5kW, 48Vdc Single Phase Hybrid Inverter with WIFI included
1   DCB-NF-2I-600V-I16A-I_II-2O 600V Protection Box 2 Inputs 2 Outputs 16A Isolator Type I_II SPD
1   HUB-AM2-5500 Hubble Lithium AM2 5.5kWh 51V Battery
2   CABLE-25-1-HV-PAIR 25mm2 single-core HV DC cable 1m - Pair
1   KETO-00-125A KETO Battery Disconnector with 125A Fuses
4   HLK-LUG25-8 25mm2 by M8 Ring Terminal Lug
1   SUN-CAN-3M 3m CAN BMS cable for Solis,sunsynk & Pylontech Lithium batteries
1   ACDB-ARENB-25A Earth Neutral Bridge Box Single Phase 25A

 

Full Installation Notes

  • Installation offering for JHB, Port Elizabeth, Alexandria, Cape Town, Pretoria, Durban, Pietermaritzburg and within 50kms of those main centers.
  • No extreme angle roof types (>30 degrees) and no slate roof types that may require slate kits.
  • Extra will have to be charged if panel lifts are required or ladder rental for very high roofs.
  • Offer assumes that installation point is within 20M from mains db board.
  • Mains DB must have an existing Certificate of Compliance, extra will have to be charged if a COC needs to be done.